Abstract:
The ready-made garments (RMG) of Bangladesh has got a more preponderant facet than any
other sector in terms of growth foreign exchange earnings. This project is on “Study on
Industrial Engineering in Woven Short Pant Production’’. This paper inaugurates the various
concepts utilizing method, time, limit and production study, it is conceivable to increase
productivity while diminishing wastage. Work study took a record the actual individual
capacity of per worker. We have enrolled the existent cycle time to per worker for each and
every worker and helper to invent the ideal number minute of worker, category of machine,
particular capacity. To find out style no:1, the standard minute value (SMV)=18.91, in
additional to that we have counted the target=1269, pcs, pitch time=0.44, upper control
limit=0.51, lower control limit= 0.37, efficiency=100%, manpower= 40, capacity=1078pcs,
labour productivity. This paper addressed pants dimensions sheets for men, structure and
procedure malfunction schedules, SMV estimate for each operation. Goal period calculation,
command maximum, efficiency reduction, system wise capability, as we other research
information methods and tools.