dc.description.abstract |
As technology is advancing the consumptions of power is gradually rising. There are three steps for proper electrification these are Electric Power Generation, Electric Power Transmission and Electric Power Distribution. These three steps are equally important for proper electrification, without any one of this three the electricity system will be incomplete. Power Grid Company Ltd is the only authorized company for the Electric Power Transmission sector in Bangladesh by BPDB (Bangladesh Power Development Board) company. Bangladesh Rural Electrification Board (BREB) has many sub-stations all over the country and which are connected through the distribution line, these stations are called substation. This report paper provides the synopsis assessment of all the systems existing 33/11KV Narayanganj Palli Bidyut Samity-1. Bangladesh Rural Electrification Board (BREB) has the vast electricity distribution network all over the country and the electric power plants are connected to the transmission line to assure the continuity of electric power. The electric power plants produce the power and feed in to the transmission line. All power plants are connected in parallel with the transmission and distribution line. |
en_US |
dc.language.iso |
en_US |
en_US |
dc.publisher |
Daffodil International University |
en_US |
dc.relation.ispartofseries |
;P12780 |
|
dc.subject |
Operation System |
en_US |
dc.subject |
Equipment |
en_US |
dc.subject |
Narayanganj Palli Bidyut Samity |
en_US |
dc.title |
A Study on Operation and Equipment of Narayanganj Bidyut Samity-1 33/11 KV Substation |