Alamin, Md.; Rahman, Md. Hasibur
(Daffodil International University, 2019-06-02)
NPT in Industrial Engineering term is Non-Productive Time. The time that is spent by an operator without
producing any garment (standard minutes) like 'set up time' is called nonproductive time. This is the major
problem ...