| dc.contributor.author | Reza, Shahin | |
| dc.contributor.author | Alam, Md.Mezbaul | |
| dc.date.accessioned | 2019-06-09T10:41:54Z | |
| dc.date.available | 2019-06-09T10:41:54Z | |
| dc.date.issued | 2018-12-01 | |
| dc.identifier.uri | http://hdl.handle.net/123456789/1975 | |
| dc.description | Both little and medium-measure organizations in Bangladesh confront the Power Factor discipline which is being required by the supply experts for encroachment of statutory limits. From the power structure discernment this piece of industry is seriously dealt with due to budgetary objectives. Such endeavors run a few developments of eight hours consistently by day. All around, the power input is 11 kV three phase, which is communicated down to 440 V three phase through a delta-wye transformer of grade some place in the scope of 300 and 1000 kVA. The supply specialists present a kWh meter and a kVAh meter joining a kVA MD pointer. In this country a base power factor of 0.85 is mandatory on the HT side. Diverse parts of confirmation of the power factor, dimension of precision of the meters on moving weights with fluctuating power factors, and the legality of the discipline constrained on the ventures are discussed in this paper. Some convenient signs on the improvement of the Power Factor Meter are in like manner discussed. | en_US |
| dc.description.abstract | This paper identifies with the field of building up an electronics Digital power-factor (PF) meter to supplant the ordinary electrodynamic type. The plan depends on voltage to recurrence change and twofold rate increase methods. For the primary half estimating period, a flag relative to the pinnacle voltage Vm is connected to control the exchanging limit dimension of the comparator of the voltage to recurrence converter (VFC), while the contribution of the VFC is kept at reasonable steady dimension, hence delivering a yield recurrence conversely corresponding to Vm, which is considered and connected an information to a parallel rate multiplier (BRM). For the second half estimating period, a flag corresponding to the result of the pinnacle voltage and the power factor Vm cos(ϕ), is connected to the VFC, while the starting dimension of the comparator is kept consistent. The VFC recurrence yield is then specifically relative to Vm cos(ϕ). This is made accessible through gating system to the BRM recurrence input. The BRM recurrence yield is summed over a predetermined timeframe to give PF data. | en_US |
| dc.language.iso | en_US | en_US |
| dc.publisher | Daffodil International University | en_US |
| dc.relation.ispartofseries | ;P12835 | |
| dc.subject | DIGITAL, POWER, FACTOR, METER | en_US |
| dc.title | DEGIEN AND IMPLEMENTATION OF DIGITAL POWER FACTOR METER | en_US |
| dc.type | Other | en_US |