Abstract:
This project is on work study in different types of garments we calculate all the SMV of
the operator & maximum target operation of the operator.This project work helps to We
know that the SMV of the operator, Target of the maximum production, Efficiency of the
operator.So If We Maintain the proper way or track on work study calculation very short
time We have calculate this thesis paper Target production. We have to difference
between the tops and the bottoms products of garments & we also calculate the SMV
wise machine production.