dc.description.abstract |
This project is on “Study on Industrial Engineering in knit garments production”.
Traditionally operated garment industries are confronting issues like low productivity,
low efficiency, longer production lead time, high remake, modify, and rejection, poor
line
balancing, low flexibility of style changeover.Theseproblemswereaddressedinthisstud
y by the use of Industrial Engineering. This paper introduces the various concepts
utilizing the method,
wastage. Work-study took to record the actual individual capacity of each operator.
We have recorded the actual cycle time to each operation for each and every operator
and helper to discover the ideal number of workers, types of machines, and individual
capacity. To find out the standard minute value (SMV) = 5.239, in additional to that
we have calculated the target (100%) per day= 2288pcs,cycletime=.23 sec,
efficiency= 48%,manpower= 22,capacity= 1832pcs.In this paper, we discussed ladies T-shirt measurement sheet, layout plan, and the operation breakdown, SMV
calculation for each operation, Target calculation for each operation, cycle time,
efficiency, process-wise capacity has been calculated, and others tools and techniques
which consist of different experimental details, experimental result, and discussion. |
en_US |