Abstract:
We got an opportunity to complete our field study at Summit Narayanganj Power Unit 2
Limited Our internship started on 6 October 2019 and ended on 5 December 2019. We got
practical knowledge about power plants and observed the operating system of power plants.
There we also got the knowledge of power distribution and maintenance of that plant.
Protection and controlling of the equipment of the power station are a very important and
complicated task. With the help of the plant engineers, we observed the control room and
protective equipment such as relays, circuit breakers, rectifiers, battery houses, etc. very closely,
understood the functions, and controlling the system of that equipment. In addition, we gathered
practical experience about different major components of power station such as diesel engine,
alternator operation and control unit, and maintenance procedures of the plants. We gathered
practical knowledge about different types of equipment used in the substation of the plant such
as power transformers, bus bars, and substation protection systems.