Abstract:
This project is on “Study on Industrial Engineering in Woven garments production”. Traditionally operated garment industries are confronting issues like low productivity, low efficiency, longer production lead time, high remake, modify, and rejection, poor line balancing, low flexibility of style change over etc. These problems were addressed in this study by the using of Industrial Engineering. This paper introduces the various concepts utilizing method, time, limit and production study, it is conceivable to enhance productivity while reducing wastage. Work study took to record the actual individual capacity of each operator. We have recorded the actual cycle time to each operation for each and every operator and helper to discover the ideal number of worker, type of machines, and individual capacity. To find out the standard minute value (SMV) = 23.44, in additional to that we have calculated the target= 1536 pcs, pitch time= 0.46, upper control limit=0.61, lower control limit= 0.31, efficiency= 100%, manpower = 60, capacity = 1077 pcs, labor productivity. In this paper we discussed about sleeve less ladies tops measurement sheet, layout plan, and the operation breakdown, SMV calculation for each operation, Target calculation for each operation, pitch time, upper control limit, lower control limit, efficiency, process wise capacity has been calculated, and others tools and techniques which consist of different experimental details, experimental result and discussion