dc.description.abstract |
This thesis is on “Study on Determination of Electricity Distribution Cost of JPBS”. Day-today challenges are becoming difficult to meet up the power crisis, especially in rural areas to meet
up the power crisis. So, the government established the Rural Electrification Board (RRB) from
the Bangladesh Development Board (BPDB) to meet up the rural electricity demand. This
organization plays a significant role for the rural people. The purpose of this paper is to give a brief
overview of REB and at the same time the socio-economic impact of REB reconsideration is
emphasized. In my thesis, I have tried to study on whole power distribution scenario of Jamalpur
Palli Bidyut Samity (PBS) for calculation of 2017-2018 fiscal years. A details study on primary
data such as energy import, energy consumption, monthly consumer etc. has been discussed. This
paper also demonstrated a details study on total distribution cost, distribution cost per unit, supply
cost, supply cost per unit, total revenue per unit, energy purchase cost, system loss, surplus etc.
The main goal of this thesis show that Jamalpur PBS is losable Palli Bidyut Samity (PBS). |
en_US |