dc.description.abstract |
This task gives the idea of designing a sub-station. By public demand they ordered us to make their required instruments. Sometimes they order instrument to us with the complete plan and design, sometimes we get order with the rating of instrument then we plan and we design. Sometime we do the complete project of a sub-station. We make transformer and all necessary panels for controlling and maintaining that sub-station. We also provide services to our honorable customers. If they have any damage products , we provide service to them.
Sub-station is all about power distribution. It is very much important for an Electrical and electronic Engineer. It is vital part of complete electrical system. So choose it because we always interested about how the power distributed as it is also very important for us. We have learnt many important things which strongly related with our study. We can use this knowledge in our real life as it has great section to use this knowledge.
We have invested our full day to achieve important knowledge and experience which will help us to develop power distribution system. We learn every steps of power distribution system related to a sub-station.
To accomplish this sub-station Transformer, VCB, LBS, Transformer, ATS, HT switchgear, LT switchgear, Power Factor Improvement (PFI), Magnetic Contact Switch, Module Case Circuit Breaker (MCCB), Miniature Circuit Breaker (MCB), ACB and Copper bars are used |
en_US |