dc.description.abstract |
We completed our thesis project on Study on Increase Productivity in Garments Industry by Work
Study. This paper clearly explains how to increase the Productivity in Garments section through
Work Study. In-line garments Productivity report, Machine Layout report, Capacity study,
Production study, Line balancing, Motion study, Method study, 5S method. This project based on
the different types of Study in sewing line. In the textile industry, Productivity is basically increase
by sewing line faultless production. This Project is done by Dhaka Fareast Limited. In this
Factory sewing section has 1 floor only. Average daily production capacity of 7,500 pieces of knit
garments with gents, ladies and kids items. Knit unit with a production capacity of 7000 pieces
knitted garments per day, the number of line 12, the number of M/C 340, the number of manpower
1650. In this report we also focus on important of Production capacity, how to control sewing
faults and increase productivity apparel industry and how to produce defect less quality product.
In our project, we have investigated sewing line production report, hourly production report and
quality control reports from sewing input to output of finishing section. From the analysis of the
reports, we can find how to increase productivity in apparel industry based on work Study such as
Operation Breakdown, Machine Layout report. Capacity study, Production study, Line balancing,
Motion study, Method study, 5S method, etc. |
en_US |