Abstract:
This thesis paper contains the overall procedure of SMV and operation Breakdown of the garments
industry. We visited to Opex and Sinha Textile & Esquire Knit Composite Ltd. Collecting the
SMV, production target, Efficiency% Line capacity and its related data. We completed in time
study, production, capacity study, Operation Breakdown, Target, and Efficiency.
After applying all those, we have compared before and after situation, labor productivity and line
efficiency. Finally proposed production layout has been modeled and ensures a better productivity.
In this paper, we discussed some procedure about time, Capacity, Target, SMV, and production
study and analysis of different method and also discussed about operation breakdown and other
tools and technique which consists of different experimental discussion, experiment result and
discussion this analysis. We can know about the different item SMV. We are analysis five items
operation bulletins. We achieved result of product SMV for Polo T-Shirt is 12.02, Accelerator TShirt is 18.48, Ladies Short Sleeve T-Shirt-Shirt is 11.32, T-Shirt is 5.6 and Polo T-Shirt is
10.11. And also achieved the result of product of Polo T-Shirt is 1747, Accelerator T-Shirt is
950, Ladies Short Sleeve T-Shirt-Shirt is 1550, T-Shirt is 2300 and Polo T-Shirt is 2300.