Abstract:
This thesis paper contains the overall procedure of Industrial Engineering (IE) in the
garments industry. We have visited on Robintex Group at Vulta, Rupganj, Narayanganj to
research the operation breakdown, standard minute value (SMV), production target,
efficiency%, capacity, labor productivity, method study, time study, performance rating
calculation and its related data as the Industrial Engineer working procedure.
We have completed our research to gained depth knowledge study on industrial engineering
in the sewing section at normal sewing line and just in time (JIT) line. After applying all
those, we have compared before and after situation of labor productivity and line efficiency.
Finally proposed production layout has been modeled and ensures a better productivity. In
this paper, we discussed some procedure about time, Capacity, Target, SMV, and production
study and analysis of different method and also discussed about operation breakdown and
other tools and techniques which consisted of different experimental discussion, experiment
results and discussion this analysis can know about the different items of SMV, efficiency
wise production variation. We are analysis four items operation bulletins as work dividing
plan. We are achieved result of product SMV for Naomi Is Top 4.37, Tilly Solid 5.74, Erik
Basic Fit Tank Top 3.80, Gabbi Tank 4.10. And also we have achieved result of product
Efficiency% for Naomi Is Top 55%, Tilly Solid 52%R, Erik Basic Fit Tank Top 52%, Gabbi
Tank 55%.