dc.description.abstract |
The internship report titled “STUDY ON MAINTENANCE SYSTEM OF SANTAHAR 50
MW PEAKING POWER PLANT”. This is basically diesel engine base power plant. This type
of power plant fuel source is diesel and furnishes oil. Diesel is called LFO (low fuel oil) and furnish
is called HFO (heavy fuel oil). The main objective of the internship is to study the various
equipment of the power plant and extrovert our theoretical knowledge to the practical field with
adequate conceptualization and understanding the performance of parameters in case of Power
generation, Operation, Maintenance and troubleshooting of Engine, Control Panel, Transformer,
Circuit breakers.
This power plant have six diesel engine. Which used as the prime mover of the alternator. Each
engine’s installed capacity is 8.73 MW. |
en_US |