Abstract:
The ready-made garments (RMG) of Bangladesh has got a more preponderant facet than any other
sector in terms of growth and foreign exchange earnings. This project is on “Study on Industrial
Engineering in Woven garments production”. This paper inaugurates the various concepts utilizing
method, time, limit and production study, it is conceivable to increase productivity while
diminishing wastage. Work study took a record the actual individual capacity of per worker. we
have enrolled the existent cycle time to per worker for each and every worker and helper to invent
the ideal number minute of worker, category of machine, particular capacity. To find out style
no:1, the standard minute value (SMV)=18.91, in additional to that we have counted the
target=1269 pcs, pitch time=0.44, upper control limit=0.51, lower control limit=0.37,
efficiency=100%, manpower= 40, capacity= 1078 pcs, labor productivity. To find out style no:2,
the standard minute value (SMV)= 17.31, furthermore, we measured the target= 1386, pitch time=
0.39, upper control limit= 0.45, lower control limit= 0.33, efficiency=100%, manpower=40,
capacity= 1138 and operator productivity. This paper addressed pants dimensions’ sheets for men,
structure and procedure malfunction schedules, SMV estimate for each operation. Goal period
calculation, command maximum, efficiency reduction, system wise capability, as we other
research information methods and tools.