DSpace Repository

Study on SMV and line balancing of garments

Show simple item record

dc.contributor.author Zaman, Md.Tarek
dc.contributor.author Imtiaz, Md.Shamim
dc.contributor.author Motaleb, Md. Abdul
dc.date.accessioned 2018-08-08T04:47:42Z
dc.date.accessioned 2019-06-10T10:24:43Z
dc.date.available 2018-08-08T04:47:42Z
dc.date.available 2019-06-10T10:24:43Z
dc.date.issued 2018-04-06
dc.identifier.uri http://hdl.handle.net/20.500.11948/2765
dc.description.abstract We completed our thesis on “Study on SMV and Line balancing of Garments”. This paper clearly explains the total operation of long sleeve shirt and SMV calculation. Total SMV of long sleeve shirt is 22.41 and we also done compare the before line balancing and after line balancing. At last we have seen this result summary that production are increasing by doing line balancing than before line balancing .To do line balancing production are increasing 21 per hours than before line balancing . After Line balancing gain Productivity increase, Smooth work flow, balanced cycle time, Easy fault finding, reduced bottleneck, balanced line efficiency, Reduction operation breakdown, and Equal distribution of work Skilled, semiskilled & unskilled co-ordination and Easy way to supervise. en_US
dc.language.iso en_US en_US
dc.publisher Daffodil International University en_US
dc.subject SMV and Line balancing of Garments en_US
dc.subject Balancing Method en_US
dc.subject Classifications of assembly line system en_US
dc.title Study on SMV and line balancing of garments en_US
dc.type Thesis en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record

Search DSpace


Browse

My Account