Abstract:
This project is on “Study on Industrial Engineering in Woven garments production”.
Traditionally operated garment industries are confronting issues like low productivity, low
efficiency, longer production lead time, high remake, modify, and rejection, poor line
balancing, low flexibility of style change over etc. These problems were addressed in this study
by the using of Industrial Engineering. This paper introduces the various concepts utilizing
method, time, limit and production study, it is conceivable to enhance productivity while
reducing wastage. Work study took to record the actual individual capacity of each operator.
We have recorded the actual cycle time to each operation for each and every operator and
helper to discover the ideal number of worker, type of machines, and individual capacity. To
find out the standard minute value (SMV) = 22.70, in additional to that we have calculated the
target = 723 pcs, pitch time = .50, upper control limit = .62, lower control limit=. 38, efficiency
= 72%, manpower = 45, capacity = 651, labor productivity. In this paper we discussed about 5
pocket denim pant’s measurement sheet, layout plan, and the operation breakdown, SMV
calculation for each operation , Target calculation for each operation, pitch time, upper control
limit, lower control limit, efficiency, process wise capacity has been calculated, and others
tools and techniques which consist of different experimental details, experimental result and
discussion.